Project Detailsx

Client:Ashmore Constructions
Location:2 – 6 Branson Street, Jimboomba
Value:$7,000,000+
Year Completed:2018
Category:Commercial Childcare Centres

Development Detailsx

–  Childcare Centre (accommodating 120 children and 23 full time staff)
–  911sqm of GFA
–  Carpark (847sqm) and Play Area (992sqm)
–  Drying Yard (13sqm), Outdoor Store (30sqm) and Ground Floor Play Area (331sqm)
–  On site car parking with 35 car parking spaces
–  Site coverage of 1,017sqm (28.5% of the 3,570sqm site area)
–  Single Storey Building (7m maximum)
–  Vehicle access provided from Branson Street

Project Overviewx

In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.